3.1 Decide on a suitable position for the
shower control. The position of the
shower control and the shower fittings
must provide a minimum gap of
25 mm between the spill-over level of
the shower tray/bath and the handset.
This is to prevent backsiphonage.
3.2 Determine the route for the incoming
hot and cold supply pipework.
3.3 Determine the route for the outlet
pipework. For further information on the
installation of the shower fittings refer
to the Installation and User Guide.
Note! The Combiflow B is supplied with
inlet connections hot left, cold right
and top outlet as standard. For
installations with reversed hot and cold
refer to section: 'Reversed Inlet
Connections'.
For installations with reversed hot
and cold supplies a reversed
temperature lever will be required.
Available from Kohler Mira
Customer Services. It is therefore
recommended that the correct pipe
orientation is achieved.
Combiflow B
3. Solid and dry-lined walls
Read the section “Installation Requirements” first.
The built-in shower control is supplied with support brackets that can be used to
install the shower control into a solid or dry-lined wall structure.
Hose Retaining
Ring
25 mm Minimum
Spill-over Level
Shower Control
Hot Inlet Cold Inlet
Outlet Pipe for BIR
BIV Outlet BIV Outlet