27
Note! Before turning on the water
supplies refer to section:
'Commissioning and Control
Assembly Installation'.
3.15 Turn on the water supplies and check
for any leaks.
3.16 Refit the building-in shroud removed
earlier. Secure the shroud in position
with the screws.
3.17 Plaster and tile as necessary up to the
sides of the building-in shroud. Make
sure that the finished tiled wall surface
is within the area as shown on the
building in shroud.
3.18 When the plaster/tiles have set,
remove the screws and pull the entire
building-in shroud away.
Retain the screws for later use.
Tiling Area
Alternative
Rear Fixing