EasyManua.ls Logo

Mitutoyo ABSOLUTE ABS AT1123 - Main Task Workflow

Mitutoyo ABSOLUTE ABS AT1123
63 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
1 Outline
No. 99MBE095B
1.3
TheFlowofMainTasks
The following chart shows the ow of preliminary preparation and installation onto the machine main
unit as tasks to use this product.
Preliminary preparation
Designing the Mounting Surface of
the Scale Unit
"2.4 Precautions on Mounting Design of Scale Unit"
Opening the Package
Checking the Components and
the Supplied Accessories
"2.2 Checking the Scale Unit and the Supplied Accesso-
ries"
Preparing the Signal Cable
"2.3 Preparing the Signal Cable"
Installation onto the machine
Mounting the Scale Main Unit and
Adjusting the Position
"3.2 Mounting the Scale Main Unit and Adjusting the Posi-
tion"
Mounting the Detector Head and
Adjusting the Position
"3.3 Mounting the Detector Head and Adjusting the Posi-
tion"
Connecting and Fixing the
Signal Cable
"3.4 Connecting and Fixing the Signal Cable"

Table of Contents

Related product manuals