EasyManua.ls Logo

Morris Quantum - Lift Control Setup

Morris Quantum
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operation
January 2019 5-15
Controller Options - Continued
Topcon - X35 Apollo - Continued
Lift Control Setup
In order to run Pressure Control or Pack Control, Lift Control must be setup rst.
In the set-up Menu go to: Implement - Seeder - Drill Control - Lift Control
Drill Control - Enabled
Lower Time - 6 seconds (user adjustable). This is the time required for all the openers to lower before entering
unseeded ground.
Warning
Openers drop with full down force when
powering up or rebooting the X35 with
hydraulics engaged.
S65155

Table of Contents

Related product manuals