Start-up
Setting up the machine and putting it into operation
34 03.06.2014
¾ Lay a soft underlayer in front of the machine
– When the housing is opened, the control terminal lies on the
underlayer.
¾ Ensure that the machine is not connected to the mains electricity.
¾ Open the housing completely (slightly more than 90 °).
– The whole control terminal is lying flat on the underlayer.
– The base plate of the machine is raised at the pivot point of the
housing by several centimetres.