3.3 Inspectionofdelivery
1. Inspect the deliver y and compare with the delivery note, order confir mation or other deliver y
documentation. M ake sure that everything is included and nothing is damaged.
2. Contact Munters immediately if the delivery is not complete in order to avoid installation delays.
3. If the unit is to be put into storage prior to installation, see section Storing the equipment.
4. Rem ove all packaging material from the unit, and make sure that no damage has occurred during
transportation.
5. Any visible damage must be repor ted in writing to Munters within 5 days and prior to installation of
the unit.
6. Dispose of the packaging material according to local regulations.
NOTE!
Ifthe dehumidifier isdeliveredasasplitunit,especiallycheckthatthe seals ontherotorbox arenot
damaged.
Figure 3.1 Rotor box seals
NOTE!
Afterdeliveryinspection, theconsignmentnoteshould besignedtoconfirmapproval ofdelivery.
3.4 Movingthe dehumidifi er
Thedehumidifier must be handled with care. All panel doors must be closed during transportation. Use
a fork lift or pallet loader to m ove the dehumidifier. The forklift/pallet loader must be equipped w ith
extended forks to ensure even weight distribution. See section 7.4, Technical data for weight data.
WARNING!
Movethedehumidifiercarefullyasthereis ariskof thedehumidifiertippingover.
Figure 3.2 Correct length on forklift arms
190TEN–106 5–J1408