A-C-2 Four Channels Click Meter Option
A-C.2 Installation
This section provides the information needed to install your PMM
9010/Click4E.
It includes the information pertinent to initial inspection and power
requirements, connections, operating environment, instrument mounting,
cleaning, storage and shipment.
A-C.2.1 Initial Inspection
When receiving the equipment, first inspect the shipping card-box for any
damages.
If the shipping box is damaged, it should be kept until the contents of the
shipment have been checked for completeness and the instrument has
been checked mechanically and electrically.
A-C.2.2 Packing and
Unpacking
Verify the availability of all the shipped items with reference to the shipping
check list enclosed with the Operating Manual.
Notify any damage to the forwarder personnel as well as to your NARDA
Representative.
To avoid further damage, do not turn on the instrument when there
are signs of shipping damage to any portion of it.
A-C.2.3 Preparation
for Use
This is a Safety Class I and Installation Category II apparatus, and it is
equipped with a protective/functional earth terminal on the rear panel.
A good safety/functional ground connection should be provided
before to operate the receiver.
A-C.2.4 Click4E Option
mains supply
PMM 9010/Click4E Option can work at either 50 Hz or 60 Hz with a supply
voltage rated between 100 and 240 Volt AC.
It is necessary to use a cable, provided of the protective earth
terminal and terminated with the right mains connector which fits the
outlet in use.