EasyManuals Logo

NEC DP-D-1D User Manual

NEC DP-D-1D
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #50 background imageLoading...
Page #50 background image
Plywood should first be installed on the wall where the Battery Box will be positioned. This allows secure
anchoring of the screws which support the weight of the Battery Box.
1. Using four supplied screws, secure the WM Support to the FM/WM Base-F and Base-R.
Four Screws
(M4 X 8)
WM Support
FM/WM Base-R
FM/WM Base-F
Figure 2-33 Assemble Battery Box Base
2. Refer to Figure 2-34 Wall-Mount Spacing Guide on page 2-25 for required spacing before drilling
holes for 10 mm anchor bolts (locally procured).
Mark and drill the four holes required to install the FM/WM Base.
SL1100 ISSUE 4.1 (R5.1)
2-24 Installation

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC DP-D-1D and is the answer not in the manual?

NEC DP-D-1D Specifications

General IconGeneral
BrandNEC
ModelDP-D-1D
CategoryTelephone System
LanguageEnglish

Related product manuals