Powering Up the System
DSX-40 Hardware Manual Installation ◆ 41
Installation
Powering Up the System
Power Up
Now that you have cabled the system, it is time to power-up.
To power up the system:
1. Make sure the system is properly grounded.
2. Plug the AC Power Cord into the Main Equipment Cabinet
3. Install a surge protector in the AC outlet.
4. Plug the Mail Equipment Cabinet’s AC power cord into its surge protector.
5. Turn on the cabinet’s power switch.
• The power LED will flash once blue, once green, and then “flutter” blue as the system boots.
• After about 45 seconds, the LED will wink off blue continuously and the system will be operational.
Power Switch
1093097 - 15
AC Power Cord