EasyManua.ls Logo

NEC DSX-40 - Finishing the Installation; Reinstalling the Cover

NEC DSX-40
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Finishing the Installation
DSX-40 Hardware Manual Installation 43
Installation
Finishing the Installation
Reinstalling the Cover
Now that your cabling is complete and the system is up and running, you should reinstall the cover.
To reinstall the cover:
1. Slide the cover onto the Main Equipment Cabinet as shown.
2. Slide the cover button to LOCK.
Figure 25: Reinstalling the Cover
1093097 - 17
Push button
to "LOCK" position

Table of Contents

Other manuals for NEC DSX-40

Related product manuals