1. Setup Procedure
Express5800/R320d-E4, R320d-M4 Installation Guide (VMware 5.5)
34
Chapter 1 Installing OS
4. Press the POWER switch on front panel to start the system from the CPU/IO module 1, and perform
Steps 1-1 to 1-14 in similar way.
Note If you disconnect power cord (AC cable) and connect it again, wait for at least 30 seconds
before pressing the POWER switch (DC) to power on. Make sure that Module POWER
LEDs on both CPU/IO modules 0 and 1 are blinking, then press the POWER switch..
5. After configuring the settings for the CPU/IO module 1, set the CPU/IO module 0 as primary.
Press the POWER switch on front panel to turn off the server.
Then, disconnect all the power cords from the server.
Note Make sure that System POWER LED is unlit before disconnecting the power cord.
6. Connect power cords in the following order to start the system from CPU/IO module 0.
(1) Connect a power cord to AC inlet connector A.
(2) Connect a power cord to AC inlet connector B.
Important Make sure that the PRIMARY LED on CPU/IO module 0 is lit.
Note If you disconnect a power cord, wait for at least 30 seconds before connecting it again.
Tips
See Chapter 1 (1.2 Preparations for Setup) for AC inlet connector.