Appendix B: Service protocol
Copy the service protocol, ll it in and save it as a service record.
NOTE! If the results of the checks (for example, measured values) differ signicantly from
previous results, investigate more carefully.
E-PAK No. Date:
Operating hours:
Performed by:
Control items Result Result Result Result
Inspect/clean outside the unit
Removedustdeposits,cleanworkarea
Remove corrosion by grinding, apply primer and touch up paint
Inspect/clean inside the unit*
Powerconductorconnectionsandgroundwires,check
Automatic start and stop, check
Automaticltercleaning,check
Manualltercleaning,check
Vacuum limiting valve, check
(both,iftwoaretted)
Cleaning valve, check
Filter bags, visual check
Filter bags, check pressure drop/performance
Clean and dry air (ISO 8573-1, class 5), check
Groundmeasurement,check(≤100ohm):
GND1 – Fan
Groundmeasurement,check(≤10
5
ohm)
Incoming duct – Incoming mains ground
GND1 – External mains ground
Gaskets, check for leakage and replace, if necessary*
Mainlter,replace
Plastic bag, replace
*Whenreplacinglterbags.