10. MAINTENANCE
Disconnect the power supply before any maintenance operation.
Turn off the proximity switch.
Always wait for the oven to cool down before performing maintenance operations.
Maintenance work must be carried out by a qualified technician.
10.1. ROUTINE MAINTENANCE
Ensure smooth operation over time of the equipment by performing periodic/preventive checks and maintenance.
10.1.1. INSPECTING AFTER DELIVERY
The following table lists a series of controls and activities that need to be carried out according to the recommended frequency.
OPERATION
FREQUENCY
WEEKLY MONTHLY AT 6-MONTHLY
INTERVALS
YEARLY
Make sure that the door closes properly.
Check the integrity of the gasket on the door and that it is
not flattened.
Check the proper operation of the fans.
Check the correct operation of the lamp.
Check the integrity of the electrical system
Check the correct operation of the fan.
10.2. EXTRAORDINARY MAINTENANCE
Special maintenance includes service, repair, and restoration of nominal operating conditions or replacement of a faulty,