Model H1301 Recovery and Recycling System
Installation, Operation and Maintenance Manual
Revision-L September, 2019
Page 69 of 105
VII. System Maintenance Procedures
M. Pressure Controller Adjustment and Calibration (continued)
2. Pressure Loop System Calibration (continued)
k. Disconnect the pressure gauge from the nitrogen vent port.
l. Shut off the nitrogen supply. Close the Manual Inlet Valve MV-1 of the machine and
disconnect the nitrogen supply from the Inlet Port.
m. Operate the N2 Valve Switch to vent the process tank to below 50 psi before
turning the machine off. DO NOT TURN THE MACHINE OFF WITH PRESSURE
HIGHER THAN 50 PSI IN THE PROCESS TANK.