K. Installation Overview
Before initially starting the Generator, verify that all of the below items are in
line with Installation requirements:
K.1 Is the Generator installed square in the Generator housing, with the Service
Access Door facing outward guaranteeing easy accessibility for start/stop, breaker reset,
emergency pull-start and servicing?
K.2 Have all exhaust and air flow, Generator housing clearances and connections
been installed and verified complete, in compliance with this Guide?
K.3 Are the oil drain, air intakes and air outflows clearly unobstructed?
K.4 Have the (6) Grade 8 installation bolts been installed and torqued to specs?
K.5 Was the Generator box installed and sealed, to prevent any exhaust from entering
RV, including all connections for electrical wiring, fuel, and exhaust?
K.6 Ensure CO and smoke detectors are fully powered and operational prior to starting
the Generator.
K.7 Test and inspect all fuel connections and lines under pressure for leaks, and
possible wear over time from contact points.
K.8 Verify correct 12Volt circuit has been installed in accordance with the
Manufacturer and NPS specifications.
K.9 All Y6000eco Generator come pre-filled with 10W40 break-in oil which must be
replaced with YAMALUBE 10W40 following initial twenty hours (20) of use.
Inspect and verify engine oil is full prior to initial start. Failure to replace oil at initial
twenty (20) hour interval or at specified maintenance intervals thereafter, may void
NPS' Limited Warranty.