NVIDIA DGX H100 Service Manual
1.4. Running the Pre-ight Test
Instructions for running the DGX stress test.
NVIDIA recommends running the pre-ight stress test before putting a system into a production envi-
ronment or after servicing. You can specify running the test on the GPUs, CPU, memory, and storage,
and also specify the duration of the tests.
To run the tests, use NVSM.
Syntax:
sudo nvsm stress-test [--usage] [--force] [--no-prompt] [<test>...] [DURATION]
For help on running the test, issue the following.
sudo nvsm stress-test --usage
Recommended Command
The following command runs the test on all supported components (GPU, CPU, memory, and storage),
and takes approximately 20 minutes.
sudo nvsm stress-test --force
1.4. Running the Pre-ight Test 3

Table of Contents

Other manuals for Nvidia DGX H100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Nvidia DGX H100 and is the answer not in the manual?

Nvidia DGX H100 Specifications

General IconGeneral
GPU8x NVIDIA H100 Tensor Core GPUs
GPU Memory640 GB HBM3 (80GB per GPU)
System Memory2 TB DDR5
Form Factor6U rackmount
Storage30TB NVMe SSD
Power Supply10kW
InterconnectNVLink 4.0