OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ote.com 19
11. Turn the PUMP switch to AUTOMATIC. Turn the DC VOLT and HEAT
switches on. And turn the COOL switch to AUTOMATIC.
12. Load the test:
a. If you will be using the software to run the test, click the Start Test
button on the Main Screen. This will open the “Load Test Infos” screen
and start the motor. Refer to page 21 for more information about
the software.
b. If you will be using the onboard controls to run the test, rst select a
test to run, then select option 1 “Run/Edit Test” from the Main menu
and press the Scroll Wheel in to start the test. This will start the motor.
Refer to page 31 for more information about the onboard controls.
13. Push the scroll wheel on the Control Panel to start the test.