STEP 5 - Base Rails
NOTE Throughout this manual all doubled up codes that refer
to 10x15 shed code first followed by the 10x19 shed code.
eg (B7/B9)
B7= Short Side Base Rail for 10x15 shed
B9 = Short Side Base Rail for 10x19 shed.
A1
A6 + A6 = A1
LONG SIDE BASE RAIL (B8/B1)
SHORT SIDE BASE RAIL (B7/B9)
X20
X20
X20
B7/B9
Gable End Base Rail
A1
X12
Overlap the Gable End Base Rail 'A1' on
top of the Short Side Base Rail 'B7/B9'.
Fix the Corner Gusset 'X20' using three
'X12' Screws.
Wall holes
Outside View
Step 2
Fasten self tapping screws 'X12'
into the top of the 'A6' anywhere
in the overlap.
1
2
Step 1
Fasten screws 'X12'
in the overlapped
wall holes first.
Step 3
Remove 'X12’s' from Step 1
when installing wall panels.
Outside View
X12
X12
A6
A6
A6
A6
Join the two 'A6' Gable Base Rails from
'Pack A' by overlapping the two end wall
holes to make one 'A1' Gable Base Rail.
X20
X20
3
13
Leave gap of approx 150mm between
Long Side and Short Side Base Rail
for the Portal Frame.