Before sealing the base rail ensure all dust has been removed. Place silicone inside the shed
covering the gap of the inside edge of the base rail and the foundation.
Silicone
Side View
Base
Frame
6.5mm x 40mm Dynabolt
STEP 15 - Dyna-Bolting Base Rails to Concrete and sealing floor
Ensure shed is square then drill 6.5mm holes into the foundation through the base rail where
holes are provided.
Fix 6.5mm x 40mm dynabolts.
Do not seal shed before anchoring to foundation.