EasyManua.ls Logo

Omron FHV Series - Page 48

Omron FHV Series
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Procedure Description Reference
Scene Editing In the Main Window (layout 0), edit
the measurement flow.
Register processing items.
Set the properties for each proc-
essing item.
Vision System FH/FHV/FZ5 series
User's Manual
Click Data save. Vision System FH/FHV/FZ5 series
User's Manual
↓↑
Testing Execute test measurements.
(In the Main Window (layout 0),
click Measure.)
Vision System FH/FHV/FZ5 series
User's Manual
Adjust the parameters for each
processing item.
Vision System FH/FHV/FZ5 series
User's Manual
Click Data save. Vision System FH/FHV/FZ5 series
User's Manual
Measuring
(Operation)
In the Main Window (layout 0), click
Switch layout, and then select
Main Window (Layout 1).
Vision System FH/FHV/FZ5 series
User's Manual
In the Main Window (layout 1),
check the communications with the
PLC.
Vision System FH/FHV/FZ5 series
User's Manual
In the Main Window (layout 1), exe-
cute commands from the PLC,
such as measurement trigger com-
mands.
Vision System FH/FHV/FZ5 series
User's Manual
Management and Analysis Save and analyze measurement
data and images.
Vision System FH/FHV/FZ5 series
User's Manual
2 Overview of FHV Series
2 - 8
FHV Series Smart Camera Setup Manual (Z408-E1)

Table of Contents

Related product manuals