EasyManua.ls Logo

Omron SYSMAC C Series

Omron SYSMAC C Series
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
This
ladder
diagram
shows
part
of
the
circuit
used
for
this
control
system.
Processing
stage
(C500
program)
0002
0001
Shortage
t
Stops
the
T
tH
+-—(on)
Stops
the
coating
stage
assembling
stage
[Assembling
stag
(C20
program)
0001
0
G
4
Detects
screw
E
i
oo
Shortage
Stops
the
$
assembling
stage
0000
1
*2
Channels
as
viewed
from
500
Channels
of
YO
link
unit
connected
to
C20
Input:
channel
01
Coating
stage
(C20
program)
i
Detects
dirty
ink
0100
Stops
the
4
coating
stage
0000
*2
Channels
as
viewed
from
C500
Channels
of
I/O
link
unit
connected
to
C20
Output:
channel
06
*1.
When
the
screw
supply
is
depleted
during
the
assembling
step,
output
relay
0600
of
the
I/O
link
unit
is
turned
ON.
Viewed
from
the
C500,
this
output
relay
is
input
relay
2900
of
the
C500,
which
is
connected
to
the
remote
I/O
master
unit.
(Since
the
I/O
link
unit
is
using
channels
28
and
29,
the
I/O
link
unit
must
be
set
as
channel
28
with
its
DIP
switch.)
Therefore,
the
signal
indicating
the
screw
shortage
that
is
output
from
relay
0600
of
the
I/O
link
unit
is
input
to
relay
2900
in
the
processing
stage.
In
response,
relay
0102
on
the
central
control
panel
is
turned
ON,
issuing
the
alarm
signal.
$2;
By
connecting
the
RUN
output
of
the
I/O
link
unit
to
input
relay
0000
of
the
C20
in
the
coating
stage,
the
other
two
stages
(processing
and
assembling)
can
be
stopped
in
case
a
failure
occurs
in
the
I/O
link
unit
in
the
coating
stage.
A-13

Table of Contents

Related product manuals