EasyManua.ls Logo

Opera Q9 - Page 21

Opera Q9
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
ENGLISH
When the insert has been inserted completely, turn the ap with the relevant wrench anti-clockwise in order to x it and restore
it with the electric energy.
Proceed as follows to release and slide the insert out on the tracks, in the event of maintenance or pellet loading:
1. Open the door using the wrench provided, inserting it into the screw opening positioned in the bottom left (see Figure
above);
2. Turn the ap clockwise. The insert is released from the base and the electric energy is cut-o at the same time;
3. At this point, it can be made to slide forward on the tracks to perform the maintenance interventions or pellet loading,
using the wrench provided inserted in the relative slot in the area under the re pot (see Figure 3 - B). The insert can also be
slid out completely from the guide tracks and extracted to maximum, lifting the front part and tilting it by about 30° (see
drawing Figure 4);
4. To re-insert the insert, follow the procedure in reverse order, after having withdrawn and lifted it using the relevant
handles present on the sides (see Figure 3 - A);
5. For the nal blockage, turn the ap with the relevant wrench anti-clockwise in order to x it and restore it with the
electric energy.
Figure 4