1=Internal air inlet (environment air vent, min. 500cm2)
2= Internal air outlet (min. 500cm2) A= Pre-existing chimney hood
opening for passage of hot air into the covering counter-hood
F=Incubated ue (min. ø
10cm, max. ø15cm)
T=Protective closure plate of the tting to the ue
Before installation, it is necessary to thoroughly clean the chimney (re surface base and ue) where the appliance is to be
inserted; proceed as indicated below:
1. Open the door using the wrench provided, inserting it into the screw opening positioned in the bottom left.
2. Turn the wrench clockwise. The insert is released from the base in this way
3. Slide the insert forward on the tracks: when it is extracted to maximum, lift the front part via the relevant handles and tilt
it by approx. 30°
4. Position the base inside the chimney and anchor it to the chimney surface via the four slotted holes prepared, using a
suitable xing system.
ATTENTION
FOR SAFETY REASONS, IT IS IMPORTANT TO ANCHOR THE FIXED BASE TIGHTLY TO THE EXISTING CHIMNEY; IF THIS OPERATION
IS NOT PERFORMED ACCURATELY, THE APPLIANCE COULD OVERTURN AND FALL ON EXTRACTION.
5. Make the tting to the ue in a way to guarantee sealing (sealed or with gaskets). IT IS PROHIBITED to use exible hoses
for the connection of the appliance to the ue.
6. Extract the two sliding guides completely and x them with magnets.
7. Re-position the appliance on the xed base, gripping the relevant handles on the sides: tilt it so that the wheels insert
themselves on the relevant tracks, make it slide until the coupling of the smoke is completely inserted inside the smoke
conveyor box.
8. For the nal blockage, turn the screw with the relevant wrench anti-clockwise in order to x it and restore it with the
electric energy.
POSITIONING THE APPLIANCE IN A PREEXISTING CHIMNEY