Installing the Server
These topics describe how to install the server into a rack using the rail assembly in the
rackmount kit. Perform these procedures if you purchased the rail assembly.
Note - In this guide, the term rack means either an open rack or a closed cabinet.
Step Description Links
1. Install optional components. “Optional Components” on page 25
2. Ensure that your rack is compatible with the server
requirements.
“Rack Compatibility” on page 26
3. Review the cautions for working with racks. “Rack Cautions” on page 27
4. Use anti-tilt mechanisms to ensure that the rack does
not tip when the server is installed.
“Stabilize the Rack” on page 28
5. Prepare the slide rails, mounting brackets, and slide rail
assemblies for server installation.
“Install the Rackmount Hardware” on page 29
“Attach Slide Rail Assemblies to the Rack” on page 31
6. Install the server in the rack. “Install the Server Into the Slide Rail Assemblies” on page 35
7. (Optional) Install the CMA. “Attach the CMA to the Server” on page 41
Related Information
“Preparing for Installation” on page 15
“Connect Cables” on page 51
Optional Components
Optional components, such as additional memory or PCIe cards that were ordered as part of
the server, are installed in the server at the factory before the server is shipped. Any options
Installing the Server 25

Other manuals for Oracle SPARC T8-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC T8-1 and is the answer not in the manual?

Oracle SPARC T8-1 Specifications

General IconGeneral
BrandOracle
ModelSPARC T8-1
CategoryServer
LanguageEnglish

Related product manuals