EasyManua.ls Logo

Oracle SPARC T8-1 - Verify Operation of Slide Rails and CMA

Oracle SPARC T8-1
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Verify Operation of Slide Rails and CMA
Verify Operation of Slide Rails and CMA
Note - Two people are recommended for this procedure, one to move the server in and out of
the rack, and one to observe the cables and CMA.
1.
Slowly pull the server out of the rack until the slide rails reach their stops.
2.
Inspect the attached cables for any binding or kinks.
3.
Verify that the CMA extends fully from the slide rails.
4.
Push the server back into the rack.
Installing the Server 47

Other manuals for Oracle SPARC T8-1

Related product manuals