EasyManuals Logo

Oracle SPARC T8-1 Installation Guide

Oracle SPARC T8-1
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #17 background imageLoading...
Page #17 background image
Handling Precautions
Handling Precautions
Caution - Deploy the antitilt bar on the equipment rack before beginning an installation.
Caution - The server weighs approximately 60 lb (27.22 kg). Two people are required to lift
and mount this 2U server into a rack enclosure when using the procedures in this document.
Caution - When completing a two-person procedure, always communicate your intentions
clearly before, during, and after each step to minimize confusion.
Related Information
“Physical Specifications” on page 19
“Installing the Server” on page 25
SPARC T8-1 Server Getting Started Guide
ESD Precautions
Electronic equipment is susceptible to damage by static electricity. Use a grounded antistatic
wrist strap, foot strap, or equivalent safety equipment to prevent electrostatic damage when you
install or service the servers.
Preparing for Installation 17

Other manuals for Oracle SPARC T8-1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle SPARC T8-1 and is the answer not in the manual?

Oracle SPARC T8-1 Specifications

General IconGeneral
BrandOracle
ModelSPARC T8-1
CategoryServer
LanguageEnglish

Related product manuals