84 Sun SPARC Enterprise T5140 and T5240 Servers Installation Guide December 2010
Assemble one cable for each DC power supply in your server.
Before you begin the installation procedure, verify that the required conditions
described in the following table have been satisfied.
1. Turn off power from the DC power source using the circuit breakers.
Caution Do not proceed with these instructions until you have turned off the
power from the DC power source through the circuit breakers.
2. Identify the parts that you will use to assemble the DC input power cables
For each cable, you need the items shown in. These items are provided in the
shipping kit that came with your server.
Prerequisite Condition Responsible Party
Install a DC power source that meets the server’s input power
specifications.
Customer
Secure DC power cables that meet the server’s power cabling
specifications.
Customer
Attach the DC input plug to the DC input power cables. The input plug
is provided in the server’s shipping kit.
Customer

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Oracle Sun SPARC Enterprise T5140 and is the answer not in the manual?

Oracle Sun SPARC Enterprise T5140 Specifications

General IconGeneral
BrandOracle
ModelSun SPARC Enterprise T5140
CategoryServer
LanguageEnglish

Related product manuals