EasyManua.ls Logo

Oracle ZFS Storage ZS5-2

Default Icon
191 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
b. Insert connector C into the right side-rail until it locks into place with an audible
click (frames 2 and 3). Ensure that the end latch of the center bar mount
engages with the rail notch during server pullout; see also step 14.
c. Gently tug on the right side of the CMA's rear slide bar to verify that connector
C is properly seated.
10. To prepare the CMA's connector D for installation, remove the tape that secures
the slide-rail latching bracket to connector D and ensure that the latching bracket
is properly aligned with connector D (frames 1 and 2).
11. While holding the slide-rail latching bracket in place, insert connector D and its
associated slide-rail latching bracket into the left slide-rail until connector D locks
into place with an audible click (frames 1 and 2).
Chapter 7
Installing an Oracle ZFS Storage ZS5-2 Cable Management Arm
7-8

Table of Contents

Other manuals for Oracle ZFS Storage ZS5-2

Related product manuals