EasyManuals Logo

Palfinger MBB C 750 S Assembly Instructions

Palfinger MBB C 750 S
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #42 background imageLoading...
Page #42 background image
42
Installing and connecting the platform
Carefully raise the platform and move it into the installation
position at the truck tailgate.
Maintain the installation position with the lifting equipment until
the platform is bolted to control rod and tilt cylinders.
9.2 Bolting the platform to the control rod
Make sure that the platform is in its final installation position.
Bolt the platform to the control rod. Use the spacer discs supplied
to align the platform centrally with the body.
NOTE
On a type C 750 S tail lift with a 550 control rod, you may only move the platform by
one disc from the centre.

Table of Contents

Other manuals for Palfinger MBB C 750 S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Palfinger MBB C 750 S and is the answer not in the manual?

Palfinger MBB C 750 S Specifications

General IconGeneral
BrandPalfinger
ModelMBB C 750 S
CategoryLifting Systems
LanguageEnglish

Related product manuals