3-11
1-12.Pinch Arm Unit Replacement
(Removal)
1. Remove the Pinch Solenoid Unit as refer to item
“1-10.Pinch Solenoid Replacement”.
2. Remove the cut washer (A) and remove the
Pinch Solenoid Lever as shown in Figure 1-12.
3. Remove the cut washer (B) and remove the
Pinch Arm Unit as shown in Figure 1-12.
(Installation)
1. Install the new Pinch Arm Unit follow the removal
steps in reverse order, and then Pinch Solenoid
Position Adjustment is necessary.
Figure 1-12
1-13. Loading Motor Replacement
CHART B
Model Type TYPE A TYPE B TYPE
C,D
Connector (A) P21 P2021 P611
P.C.Board (B) MECH
I/F
SERVO SERVO
(Removal)
1. Disconnect the connector (A) on the P.C.Board
(B).
2. Remove the Pinch Solenoid Unit. (Refer to item
1-10).
3. Unscrew the screw (B), and remove the
Emergency Shaft as shown in Figure 1-13.
4. Unscrew the 2 screws (C) and remove the
Loading Motor Neutral Unit as shown in Figure 1-
13.
5. Unscrew the 2 screws (D) and remove the
Loading Motor Unit as shown in Figure 1-13.
(Installation)
1. Install the new Loading Motor Unit to Loading
Motor Neutral Unit by tightening 2 screws (D).
2. Install the Loading Motor Neutral Unit by
tightening the 2 screws (C), then be careful that
the pin of Mode SW Unit should be matched to
groove position of main Cam Gear.
3. Install the Emergency Shaft by tightening the
screw (B).
4. Install the Pinch Solenoid Unit and after
installation it, Pinch Solenoid Position adjustment
is required. (Refer to item 1-11).
5. Connect the Connector (A) to the P.C.Board
(B).
Figure 1-13