EasyManua.ls Logo

Panasonic CS-VZ9SKE - Page 24

Panasonic CS-VZ9SKE
181 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
7.2.2 De-icing by 4-Way Valve Activate
Cooling Cycle Operation
INDOOR
PIPE
TEMP.
SENSOR
HEAT EXCHANGER
(EVAPORATOR)
COOLING
HEATING
OUTDOOR
LIQUID
SIDE
2-WAY
VALVE
3-WAY
VALVE
GAS
SIDE
EXPANSION
VALVE
STRAINER
MUFFLER
MUFFLER
MUFFLER
ACCUMULATOR
ALUMINIUM ELECTRIC
HEATER SENSOR
ALUMINIUM ELECTRIC
HEATER
3-WAY VALVE
SENSOR
PIPE
TEMP
SENSOR 2
OUTDOOR
AIR
TEMP.
SENSOR
PIPE
TEMP
SENSOR 1
COMPRESSOR
COMPRESSOR
TEMP. SENSOR
4-WAY
VALVE
3-WAY
VALVE
ALUMINIUM
ELECTRIC HEATER
HEAT EXCHANGER
D
I
S
H
R
INTAKE
AIR
TEMP.
SENSOR
* De-icing will be completed in around 11 minutes or the Pipe Temperature Sensor senses 26°C and above.
7.2.3 Programed Deice Operation at Heating Operation OFF
When the Sensors sense the Outdoor and Pipe Temperature below 0°C, Non Stop (Heating) Deice will be activated
automatically.
7.2.4 Forced Deice Operation by Remote-controller
Press
PRE
HEATING
(Pre Heating) button for 10 sec, Non Stop (Heating) Deice will be activated manually.
To stop operation press Stop button.

Table of Contents

Other manuals for Panasonic CS-VZ9SKE

Related product manuals