EasyManua.ls Logo

Panasonic DP-C405

Panasonic DP-C405
808 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
61
FEB 2008Ver. 1.1
DP-C405/C305/C265
2.4. Preventive Maintenance Check List
The chart outlined below is a general guideline for maintenance.
No. Mechanical Parts Ref. No.
Cleaning
Replacement/
Adjustment
Ref. Counter
Cycle
(Sheets)
Method
Cycle
(Sheets)
Procedure
i-ADF Unit
1 Pickup Roller 511 120K
Water
1
240K
Refer to
Sect 2.2.1.
of the Sevice
Manual
F7-02-12
ADF Count
2 Paper Feed Roller 508 120K
Water
1
240K
3 Separation Roller 610 120K
Water
1
240K
4 Registration Roller 1 817 120K
Water
1
-
5 Registration Roller 2 818 120K
Water
1
-
6 Transport Roller 816 120K
Water
1
-
7 Inverting Roller 809 120K
Water
1
-
8 Exit Roller 814 120K
Water
1
-
Fuser Unit
9 Fuser Belt Unit 4926 - - 120K
Refer to
Sect 2.2.4.
of the Sevice
Manual
F7-02-65
Fuser Belt
Remain Count
(Count Down)
10 Fuser Main Unit 4927 - - 240K
F7-02-66
Fuser Main
Remain Count
(Count Down)
-
Complete Fuser Unit
(Fuser Belt Unit, and
Fuser Main Unit)
4815 - - -
F7-02-65
Fuser Belt
Remain Count
F7-02-66
Fuser Main
Remain Count
Intermediate Transfer Unit
11
Intermediate
Transfer (IT) Belt
3419 - - 240K
Refer to
Sect 2.2.10.
of the Sevice
Manual
(Replace
together with
STR Unit, and
Cleaning Unit)
F7-02-51
Transfer Belt
Life Count
Down
12
First Transfer Roller
(FTR)
3546 - - 240K
13
Drive Roller Brush
Assembly
3635 - - 240K
14 Drive Roller 3604 240K Alcohol -
Refer to
Sect 2.2.10.
of the Sevice
Manual
F7-02-51
Transfer Belt
Life Count
Down
15 Tension Roller 3506 240K Alcohol -
16 Bias Roller 3501 240K Alcohol -
17 Backup Roller 3624 240K Alcohol -
18 Adjustment Roller 3612 240K Alcohol -
19
Initial Point Sensor
Roller
3507 240K Alcohol -
20 Tension Shaft 3507 240K Alcohol -
21 Initial Point Sensor 3709 120K
Dry Cotton
Swab
-

Table of Contents

Other manuals for Panasonic DP-C405

Related product manuals