K3.1.142e Manual NitroFlow Lab - 20 -
5 Installation
Follow the paragraphs in this chapter to install the NitroFlow
®
Lab.
5.1 Transport
Warning
• Transport the NitroFlow
®
Lab upright.
• Put the NitroFlow
®
Lab in the original box to transport
the NitroFlow
®
Lab over longer distances.
• Lift the NitroFlow
®
Lab with a forklift.
• For qualifications of personnel, refer to §2.1.
5.2 Define location
IMPORTANT
• The NitroFlow
®
Lab contains compressors that
generate heat; for optimal performance and lifetime it
is necessary that cooling air can be vented without
resistance. A minimum clearance distance from walls
or other objects of at least 50 cm/ 20 inches on all
sides (back, left, right and top) is a necessity; also
efficient local ventilation at the ventilation outlet is
highly recommended especially when the device is
installed under a bench
Install the NitroFlow
®
Lab on a fixed location. The location must meet the
following requirements:
• Minimum clearance of 50 cm on all sides (back, left, right and
top) as to facilitate heat removal
• Indoors
• Dry
• No continuous direct irradiation by sunlight
• Away from heat sources
• Properly ventilated room.
• Easy accessibly for operating and service