EasyManua.ls Logo

PIAGGIO Runner 125 - Page 207

PIAGGIO Runner 125
327 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- Remove the drainage screw from the tank, wash
and blow the tank properly and make sure the ac-
celeration pump intake and supply valve are clean.
- Being the valves unidirectional, blow them care-
fully with compressed air, at the inner side of the
tank for the intake valve and at the pump piston
housing for the supply valve.
- Check that there are no signs of wear in the ac-
celeration pump piston and its corresponding seat
in the tank.
- In case of wear, replace the defective parts.
- Check that the acceleration pump piston contrast
spring is not worn.
- Assemble a new O-Ring and a new bellows gas-
ket. Reassemble the piston unit on the tank.
- Assemble a new O-Ring on the tank drainage
screw and lock it.
-Check the screw tightness introducing a small
amount of fuel in the tank.
- Assemble a new gasket on the tank.
- Assemble the tank on the carburettor body fas-
tening the 4 screws.
- Wash and blow the flow screw properly and as-
semble a new O-Ring.
- Preassemble the components on the screw as
follows: spring, washer and O-ring.
- Screw the flow screw on the carburettor body.
- The screw final position should be determined by
an exhaust fumes analysis.
Runner 125 - 200 Engine
ENG - 207

Table of Contents

Related product manuals