EasyManua.ls Logo

RadTech S1SB-54A - Shear Bolts; Repositioning the Augers; Maintenance Schedule

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
OM 0495SB-A [39]
Shear Bolts
1. Always use a grade 2 shear bolt (669596) on
the fan (item 1) and special grade 5 grooved
shear bolts (657295) on the auger sections
(item 2).
2. Check the tightness of the shear bolts at
regular intervals to make sure the snowblower
is safe.
Repositioning of the Augers
After a shear bolt breaks on one of the
augers, be sure to reposition the screws as
shown in the figure below, so that they are
180° away from each other.
Maintenance Schedule
DESCRIPTION
INTERVAL
REQUIRED MAINTENANCE
Hardware
After the first 8 hours of operation
Tighten all nuts and bolts according to the Torque
Specification Table.
40 hours of operation
Connection Points
Before each equipment
connection
Visual inspection of the driveline , hydraulic/electrical
connectors and hitch connection points. Clean if
necessary.
After the first 8 hours of operation
Connection system
40 hours of operation
Visual inspection. Retighten, repair or replace if
necessary.
IMPORTANT: The two augers must
be opposite.