Installation/Commissioning Checklist
6 Start: Yes: No: In case of deviation, please comment:
Are all screws tight properly? (Terminals, contactors)?
Extractor hood is installed and works properly? Not used:
Air bae is closed and secured? All packages removed from cabi-
net? Closed GN container placed in the middle of each fan wheel
(upside down)?
Adjustments for unit door performed?
Start unit –> Self-test
All water and drain connections tight and not leaking?
Self-test successfully completed?
6.1 Electric units:
(Measure consumption aer nished self-test)
Measured Amp at 100% steam: L1: A L2: A L3: A
Measured Amp at 100% hot air: L1: A L2: A L3: A
6.2 Gas units:
(perform ue gas analysis aer nished self-test) Yes: No: In case of deviation, please comment:
Dynamic gas pressure (in hot air mode manual 300 °C / 572 °F): mbar / w. c.
CO
2
/ CO value in allowed range (please attach a printout or use
table below)?
Gas type converted?
Type of gas: G20: G25: G30: G31:
13A / 12A: Nat. Gas US:
Burner: Values at max. RPM Values at min. RPM
CO
2
CO CO
2
CO
Steam:
% ppm
% ppm
Hot air top:
% ppm
% ppm
Hot air bottom:
% ppm
% ppm
7 Function test / Instruction: Yes: No: In case of deviation, please comment:
Unit updated to latest soware version? Soware version:
Correct service telephone number, time and date set to unit?
Customer advised in basic operation (cooking modes) and safety
instructions according to “technical customer instruction (check-
list)”?
Total installation: Yes: No: In case of deviation, please comment:
Does the installation comply with all requirements of the installa-
tion manual and and all valid local laws, norms and standards?
------------------- -------------------------------------------------- -------------------------------------------
Date Signature Installer Signature Customer
Send via E-Mail:
- 39 - V07 en, Basic_Installation_Accessories
Digital version:
http://bitly.com/inst_en_usa
US/CA
Digital version:
http://bitly.com/1iubGE7
International
UK
US/Canada 12/2018