Installation/Commissioning Checklist
Installation and Commissioning Checklist
This checklist is to be completed and returned to RATIONAL within 14 days of installation
/commission to validate warranty. For detailed information, please consult the installation manual.
It is highly recommended to send pictures and service data of the unit!
Company
(Customer):
Contact person
(Customer):
Street: Postcode:
Town/Country: Telephone
number:
E-Mail: Job number:
Serial number of
unit:
Serial number
UltraVent:
Company
(installer):
Name (installer):
Date of
Installation:
Date of
Commissioning:
Yes: No: In case of deviation, please comment:
Certication mark not damaged?
Material is delivered correct, complete and without damages?
(Unit and accessories)?
1 Position and orientation: Yes: No: In case of deviation, please comment:
Distances to walls, roof and heat sources observed?
Everything leveled and xed?
2 Water connection: Yes: No: In case of deviation, please comment:
Water connection properly installed? (Independent tap, 1.5 -
6bar / 21 - 87 psi, temp. max. 30 °C / 86 °F, so water)?
Water lter installed and used properly? Not used:
Type of water lter:
3 Drain: Yes: No: In case of deviation, please comment:
Drain installed as required? (steam resistant pipe, level, angle)
Used a separated drain for each unit?
Drain used: Siphon: Open drain: Additional vent pipe:
4 Power connection electric units: Yes: No: In case of deviation, please comment:
Connection according to the manual and local regulations?
(phase breaker and power switch accessible)
Is the unit connected to a ground fault circuit interrupter?
Measured voltage (with neutral) L1 - N: V L2 - N: V L3 - N: V N - PE: V
Measured voltage (without neutral) L1 - L2: V L1 - L3: V L2 - L3: V
Fuse (current): A
5 Power connection gas units: Yes: No: In case of deviation, please comment:
Connection according to the manual and local regulations? (phase
breaker, power switch accessible, gas shut-o valve)
Measured voltage L1 - N/L2: V N - PE: V
All gas connections tested for leakage?
Diameter supplied (must be at least ¾)?
Static gas pressure: mbar / w. c.