EasyManua.ls Logo

Rational SelfCookingCenter SCC WE - Preventive Maintenance

Rational SelfCookingCenter SCC WE
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preventive maintenance
1/2
Preventive maintenance (Checklist)
Customer name: Company:
Street: Town/Country:
Telephone: E-Mail:
Serial number
unit/UltraVent
Soware
version:
Regular maintenance*
Complaint?
Yes: No: Comment, in case of a complaint:
Maintenance preparation:
- Service data and HACCP data copied to USB stick
- Unit soware is up-to-date
- There are no service or gas errors in the service history
- No grease / no dirt in the water drain
Cabinet door maintenance:
- Cabinet door, door glas and door settings are ok
- Door gasket and gasket for mobile oven rack are without damage
Interior cabinet check:
- All parts of the interior cabinet are undamaged, correctly installed and
working
Water supply / drain maintenance:
- Water distribution is leak tight, water entrance lter is clean and valves
are working
- Pumps and add-on pieces are working and leak tight
- Every component of the control box is working and clean
Steam generator maintenance:
- Steam generator and every associated part is working
- Steam pipe from SG to exhaust hose is functional and tight
Electrical maintenance:
- Electrical wiring faultless (clamps xed and isolation faultless)
- Steam heating and hot air heating are working
- Maximum pcb temperature entered to comment fiel
- Amp draw hot air (at 100%) in case of electrical units:
L1: A L2: A L3: A
- Amp draw steam (at 100%) in case of electrical units:
L1: A L2: A L3: A
Control panel maintenance:
- Control panel is working and tight
- All control elements are undamaged and working
Exhaust hood / UltraVent maintenance:
- Air lter installed and clean
- UltraVent is working and lter clean (if UltraVent installed)
- Distance between unit top edge and exhaust hood lower edge / ceiling
entered to comment fiel
Unit care instruction:
- Instruction CleanJet / Care
- Care and Cleaning of unit parts and unit components
Instruction of company technicians:
- Replacement of lter and door gasket
- Descale of the moistening valve
Only in case of gas units
Gas component maintenance:
- Gas components / gas connections are working and tight
- Flue gas analysis done and values in the permitted range
- External exhaust hood checked
*„Light“ User 1x per year / „Medium“ User 1-2x per year / „Intensive“ User 2-3x per year (for details see detail list)
V07 en, Basic_Installation_Accessories - 40 -
US/Canada 12/2018

Related product manuals