Electrical security check
Done: Comment:
Electrical security checked (leakage current, isolation and grounding)
according to local standards and laws
Gas component maintenance*
Values: Documents:
Dynamic connection pressure at manual ope-
ration mode hot air (all units are in operation)
mbar (wc) Training manual gas
CO
2
max steam - ame current - CO ppm % µA ppm
CO
2
min steam - ame current - CO ppm % µA ppm
CO
2
max HA top - ame current - CO ppm % µA ppm
CO
2
min HA top - ame current - CO ppm % µA ppm
CO
2
max HA bottom - ame current - CO ppm % µA ppm
CO
2
min HA bottom - ame current - CO ppm % µA ppm
Length CO
2
screw of the gas ventil - mm (inch) Steam: HA top: HA bottom:
*„Light“ User 1x per year / „Medium“ User 1-2x per year / „Intensive“ User 2-3x per year (for details see detail list)
Additional maintenance**
Complaint?
Yes: No: Comment, in case of a complaint:
Steam generator maintenance:
- Steam generator dismounted and non-visible areas optically tested
Water supply / drain maintenance:
- Hand shower dismounted and checked for functioning and tightness
Check of the installation:
- Installation is in accordance with installation instructions
- Connections are in accordance to local regulations
If a water treatment is used, indicate the manufacturer and if applicable
the measured values:
Caution: The use of sodium ion exchangers is not recommended
Only in case of gas units
Additional maintenance of gas units:
- Burner dismounted and cleaned
- Ignition electrode, dismounted, checked and cleaned
** Additionally during regular maintenance every 10,000 hours of operation or aer 3 years
Operating hours
per day
Focus of use
Steaming & baking Mixed use (Restaurant)
High temperatures
> 220 °C (428 °F) or
ILC usage
High temperatures and
high-grease products
12 h - 24 h Medium Medium Intensive Intensive
4 h - 12 h Light Medium Medium Intensive
< 4 h Light Light Medium Medium
Recommendation: *„Light“ User 1x per year / „Medium“ User 1-2x per year / „Intensive“ User 2-3x per year
The activities associated with the customer‘s maintenance package were executed correctly and the corresponding elds of the over-
view list were lled out completely and correctly.
Date Signature service partner Signature customer
Sebs V5 - 10/17 en
2/2