EasyManua.ls Logo

Renault F9Q - Page 74

Renault F9Q
993 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10A-68
ENGINE AND CYLINDER BLOCK ASSEMBLY
Oil pressure sensor: Removal - Refitting
F9Q
10A
REMOVAL
I - REMOVAL PREPARATION OPERATION
a Remove:
-the engine undertray bolts,
-the engine undertray.
II - OPERATION FOR REMOVAL OF PART
CONCERNED
a Disconnect the oil pressure sensor connector (1) .
a Remove the oil pressure sensor (2) .
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
a Refit the oil pressure sensor.
a Torque tighten the oil pressure sensor (35 Nm).
a Connect the oil pressure sensor connector.
II - FINAL OPERATION
a Refit the engine undertray.
Tightening torquesm
oil pressure sensor 35 Nm
135653
135654

Table of Contents

Related product manuals