EasyManua.ls Logo

Renault F9Q - Page 867

Renault F9Q
993 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
19A-100
COOLING
Electric water pump: Removal - Refitting
F4R
19A
REFITTING
I - REFITTING OPERATION FOR PART
CONCERNED
a Refit the electric coolant pump.
a Connect
-the electric coolant pump connector,
-the electric coolant pump hoses.
a Position the clips on the electric coolant pump hoses
using the tool (Mot. 1448).
a Remove the tools (Ms. 583) from the cooling hoses.
II - FINAL OPERATION
a Refit:
-the electric coolant pump clips,
-the engine undertray.
a Connect the battery (see Battery: Removal - Refit-
ting) (80A, Battery).
a Perform the following operations:
-top up the coolant level,
-bleed the cooling system (see 19A, Cooling, Coo-
ling circuit: Draining - Refilling, page 19A-17) .

Table of Contents

Related product manuals