EasyManuals Logo

Rosenbauer FOX User Manual

Rosenbauer FOX
97 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #45 background imageLoading...
Page #45 background image
Operation
45 / 97
Preparation for initial operation
7Operation
7.1 Preparation for initial operation
The sequence of the described processes is to be maintained without ex-
ception!
Before initial start-up, check the correct fluid level of all consumables.
Oil in priming pump.
For further information refer to Chapter "Priming pump"
Coolant in compensation tank of the pump engine.
For further information refer to Chapter "Engine coolant inspec-
tion"
Fuel in tank.
The portable fire pump is delivered in empty state, fill the fuel tank
before initial start-up.
For further information refer to Chapter "Fuelling and refuelling:"
Oil in pump engine.
For further information refer to Chapter "Engine oil level control"

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rosenbauer FOX and is the answer not in the manual?

Rosenbauer FOX Specifications

General IconGeneral
Pump TypeCentrifugal
Max Pressure10 bar
TypePortable Fire Pump
Priming SystemAutomatic
Engine Type4-stroke petrol engine

Related product manuals