Operation
45 / 97
Preparation for initial operation
7Operation
7.1 Preparation for initial operation
The sequence of the described processes is to be maintained without ex-
ception!
Before initial start-up, check the correct fluid level of all consumables.
► Oil in priming pump.
For further information refer to Chapter "Priming pump"
► Coolant in compensation tank of the pump engine.
For further information refer to Chapter "Engine coolant inspec-
tion"
► Fuel in tank.
► The portable fire pump is delivered in empty state, fill the fuel tank
before initial start-up.
For further information refer to Chapter "Fuelling and refuelling:"
► Oil in pump engine.
For further information refer to Chapter "Engine oil level control"