When loading/unloading or transporting the equipment to the site, be sure to use suitable loading
(e.g. cranes, trucks) and hoisting equipment. Hoist and transport the components securely so that
they cannot drop, taking into consideration the package’s size, weight and centre of gravity and
fragile parts.
In figure 2 there are the correct indications for the lifting of the runways during the connecting
cables phase:
1. runways lifting without play detector
2. runways lifting with support (ex. metal sheet) placed in the entry runway fixing plate
3. runways lifting with hydraulic play detector
4. lift lifting (pay attention to the hydraulic hoses).