Be sure the working area is free from people and objects;
Be sure the electrical system feeding voltage is equal to that of the control box supplied with
the lift (230 V or 400 V);
Verify that the control desk is powered;
Pour oil in the tank :
a. about 20 liters a little at a time (for models N and AT );
b. about 30 liters a little at a time (for models LT and LTAT);
Supply power to the lift turning the main switch on;
Verify that the motor direction of rotation is that shown on the label; if not interchange the
phases;
Press the override button (15) then press the UP button (7). so the platform P1 will reach the
top position and, at this point only, the platform P2 will reach in turn the same height.;
Hold the buttons pressed for further few seconds until air in the cylinder P2 comes out;