Press the DOWN button (8) until the platforms reach the security height (400 mm);
i In case of platform difference in height, the photocell is operated preventing lift from
lowering up to the safety height: in this case press simultaneously the override button (15)
and the DOWN button (8);
press final lowering button (5).
FOR MODELS “LT” AND “LTAT”:
Turn the selector (11) in auxiliary lift position;
Push the UP (7) to raise the lift-tables;
After stopping the lift-table platform P2, proceed with the bleeding as described below:
Push simultaneously the override (15) and UP button (7) until the lift-tables reaches the
maximum height ;
Push, for a few seconds, both buttons until the P2 cylinder hole return hose is bled;
Push the DOWN (8) button for lowering the platforms to the safety height (130 mm);
press final lowering button (5)
NOTE: PLATFORMS LOWERS WITHOUT MOTOR SUPPORT BECAUSE IT STARTS AFTER DEACTIVATING THE
UP LIMIT SWITCH ON P2 LIFT-TABLE
7.9 CHECKS AND INSPECTIONS
Platform leveling and alignment;
Fix the lift to the ground with 8 anchor bolts (min. recommended size ø = 16 mm tighter ),
bolts, connectors and connections.
Clean all parts of the equipment
connections as per diagrams
lift grounding (earthling)
operation of the devices and limit switches
7.9.3 HYDRAULIC SYSTEM CHECK
proper oil level in the tank
no leakage and blow-by
cylinder operation
7.10 SET UP AND ADJUSTMENTS
Carry out two or three complete cycles of lowering and lifting and check:
the lift for reaching its maximum height
the max height limit switch for proper operation
the lowering limit switch for proper operation