,-
'""r
.•
~;-;-----
~
I
Chapter 1 Operation Procedures
I!::::::=D=o=~
ff
(1)
I!::::::=D=o=~
Operation Edition - 18
When pushing the plate load button, the starting
buzzer sounds. After the buzzer sounds, push the
button again. The press will start to crawl and stop
automatically at the plate mounting position.
After that, the buzzer sounds.
Open the safety cover and insert and contact the plate
onto the positioning pins (1) on the leading edge
clamp.
On the first unit, set the plate on the plate holding
guide
(2).
(Note) When reusing a plate, please straighten the
bending part
of
the leading edge by your
hands.
Push the plate load button. The leading edge clamp
will close. Close the safety cover and push the button
again. The press will start to
mount
the
plate
automatically.
After that, the buzzer sounds.
(Reference) Set the plate pressure adjustment scale
on 0.15.