AK6-QE-006-03 - 10 - 05/2017
8-2. Removing Tape and Foam Packing from the Inside of the Instrument
(1) Remove foam packing from between the robotic arm and the slide rail.
(2) Remove the tape that fastens the basket holder. Remove foam packing from under the holder.
(3) Remove foam packing from the reservoir trays. Remove foam sheets and plastic band.
(4) Remove the 3-position and 4-position reservoir trays from the inside of the instrument once. Remove
foam sheets and adhesive tape that holds wash station nozzles in place.
(5) Make sure that all tape and foam packing material are removed from the instrument.
Foam packing
Foam sheets
Tape for wash station nozzles