LED R&D Lab(VD)
16
2. Preparation of Cabinet installation
◆ Pre-prepare before installation
① To remove SET packaging, a ceiling space 600mm higher than the minimum SET packaging is required.
② If there is not enough space, disassemble the SET packaging in the possible space 
and move the cabinet to the installation space.
Fig.1 Packing disassembly space
SET packing
Ceiling wall
1982mm
600 +@ mm
PALLET