LED R&D Lab(VD)
17
LED set
Box
Top-Cushion
Bottom-Cushion
Accessory
Left2
Left1
Right1
Right2
2. Preparation of Cabinet installation
◆ Pre-prepare before installation
① Remove the tape of the top BOX and open it. (Fig.2)
② Remove the top–cushion.
③ Check the set status. (Two rear parts and four front parts) (Fig.3)
Fig.1 Packing
Fig. 2 Packing out
Fig.3 check the SET
There are number of cabinet