EasyManua.ls Logo

Samsung LH015IAC Series - 4. FRAME installation and cable connection

Samsung LH015IAC Series
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LED R&D Lab(VD)
40
SMPS
Bd
SMPS
B’d
LEFT-FRAME
RIGHT-FRAME
Connect the cable below whenever you hang one ASSY BRACKET P-FRONT to the P-FRAME. (130”)
- After creating a space by pulling the bottom of the P-FRONT, connect the OCM cable to the CN311 of the BN41-03167A board
- After attaching P-FRONT to P-FRAME, connect BN41-03167A of P-FRONT and BN41-03167A of P-FRAME
- The pile of cables exposed to the bottom of the set is pushed into the gap between P-FRONT and P-FRAME
Lower Interface
4. FRAME installation and cable connection
Fig.1 Securing space at the
bottom of FRONT
Fig.2 Connect OCM cable
OCM cable

Table of Contents

Related product manuals